Revision Summary

Date Section Revision
April 25, 2005 Section I:  Introduction – Added minimum requirement of ISO9000 certification.
  Section III: Supplier Performance Evaluation – Remove specific evaluation reporting frequencies.
  Section V:  Corrective and Preventive Action -Revised Safety Rules to include permission to wear knee length shorts.

-Clarified $40 per man-hour charge for DTR sorting activity.

-Added note that effective January 1, 2006 DTR-OH will be a smoke free property.

-Added an Administrative Fee when a sort is required at DTR and/or its customer.

  Section VII:  Process Changes -Revise instructions for submitting a PCR based upon new Supplier PCR form.

-Added flow chart.

-Specify all Supplier PCRs be submitted to DTR Purchasing.

  Section VIII:  Advanced Product Quality Planning -Removed reference to specific documents of APQP Tracking Matrix, Tooling Progress Report and APQP Checklist.  Change requirement to a Project Schedule.

-Specify monthly schedule updates submitted to the APQP coordinator at the appropriate plant location.

  Section X:  Packaging, Labeling and Delivery -Reorganized the section.  Added Packaging Standard Requirements, Packaging Deviation, Labeling containers and skids, Barcoded Lot Numbers, Manifest Ordering/Inventory Requirements and charges for nonconformances.
  Section XIII:  Lot Traceability -New Section.
  Part Submission Warrant (EX2.03.00.02) -Updated AIAG format.
  Supplier Process Change Request

(MF9.04.01.02)

-Discontinue use of DTR Process Change Request and use new form specifically for suppliers.
  DTR Returnable Packaging Deviation Request (PC15.01.00.06) -Add Part number to Container Inventory.
  AIAG Label Format

(PC15.01.00.03)

-Added Barcode of lot number.
  Lot Number Display Detail

(MF8.01.00.33)

-New Form.
  Supplier PPAP Checklist

(EX2.04.00.04)

-Added LNDD.
6/30/2006 Introduction -Changed reference from QS-9000 to TS-16919.

-Added requirement for TS-16949 certification or obtain waiver from DTR.

  Advanced Product Quality Planning -Clarifications within the requirement to track APQP activities:

Item 2)  Project Schedule to include PPAP submission.

Item 5)  PPAP with Part Submission Warrant and Approval.

-Added requirement for trial parts evaluation and data submission to DTR.

-Added that a QIS may be issued for late or missed trial part shipments, late project summary updates or late PPAP submissions.  Clarify that these will affect the supplier’s delivery performance.

  Control of DTR Owned Material and Equipment -Added use of the Tooling/Equipment Inventory List and annual update in January.

-Added use of the Request for Retirement of Asset form.

  Lot Traceability -Added instructions for completing the LNDD.
  FORMS  
  Supplier PPAP Checklist

(EX2.03.00.04)

-Specified that a copy of the Approved LNDD must be included in the PPAP
  Part Submission Warrant

(EX2.03.00.02)

-Updated to comply with PPAP Fourth Addition.
  Inspection Standard

(EX2.03.00.01)

-Added section for Critical Characteristics.

-Comments added to the cells to provide instructions for completing the form.

  Lot Number Display Details

(MF9.01.00.33)

-Removed redundant and unnecessary information; Critical Process, Location of Lot Number, Production to record this number.

-Allow for multiple part numbers on the one sheet.

  Tooling/Equipment Inventory List

(PR6.01.00.04)

-Added Asset number.
  Request for Retirement of Asset

(PR7.04.00.00)

-New Form.
July 1, 2006 Section I:  Introduction -Changed reference from QS-9000 to TS-16949.

-Added requirement for TS-16949 certification or obtain waiver from DTR.

  Section VIII:  Advanced Product Quality Planning -Clarifications within the requirement to track APQP activities:

Item 2) Project schedule to include PPAP submission.

Item 5) PPAP with Part Submission Warrant and Approval.

– Added requirement for trial parts evaluation and data submission to DTR.

– Added that a QIS may be issued for late or missed trial part shipments, late project summary updates or late PPAP submissions.  Clarified that these will affect the supplier’s delivery performance.

  Section XII:  Control of DTR Owned Material and Equipment -Added the use of the Tooling/Equipment Inventory List and annual update in January.

-Added the use of the Request for Retirement of Asset form.

  Section XIII:  Lot Traceability -Added instructions for completing the LNDD.
  Supplier PPAP Checklist

(EX2.03.00.04)

-Specified that a copy of the Approved LNDD must be included in the PPAP.
  Part Submission Warrant (EX2.03.00.02) -Updated to comply with the PPAP Fourth Edition.
  Inspection Standard

(EX2.03.00.01)

-Added section for Critical Characteristics.

-Comments added to the cells to provide instructions for completing the form.

  Lot Number Display Detail

(MF8.01.00.33)

-Removed redundant and unnecessary information: Critical Process, Location of Lot Number, and Production to record this number.

-Allow for multiple part numbers on one sheet.

  Tooling/Equipment Inventory List

(PR6.01.00.04)

-Added Asset Number.

 

-Specified Supplier and address and tooling location if different.

  Standard Packaging Form

(PC15.01.00.01)

-Corrected errors in the drop down boxes.

-Comments added to the cells to provide instructions for completing the form.

-Approval section clarified.

  Request for Retirement of Asset -New Form.
May 30, 2008 Section II: Purchasing -Complete revision.
  Section III: Production Part Approval Process -Clarification for the quantity of sample parts needed for PPAP submission.
  Section V:  Corrective and Preventive Action -Specified that in the event that timely and effective countermeasures are not taken, the supplier may be required to present their corrective action activity at DTR’s facility.

-Added the requirement for a 3I-3A Report to be completed and submitted within 24 hours after notification of a defect.

 

May 30, 2008

(continued)

Section VIII:  Advanced Product Quality Planning -Clarification that trial parts are off-tool parts which require dimensional and performance data to be provided.
  Section X:  Packaging, Labeling, Delivery & Ordering/Inventory -Added barcode qualifiers for Container Labeling.

-Specified that before a part number level change can be implemented on the label, the supplier must ensure PPAP approval has been given.

-Added requirements for DTR/Toyota labels.

-Defined requirements for contact about mis-shipment and/or expedites.

-Added requirement for acknowledgement of manifest.

  Section XIV:  Heat Treat Specification -New section.

-Requires compliance by July 1, 2008.

  Section XV: Conditions of Purchase -Re-numbered section.
  Section XVI: Acronyms and Their Meanings -Re-numbered section.
  Section XVII: DTR Terminology -Re-numbered section.
  Section XVIII: Forms -Re-numbered section.
  Supplier Countermeasure Activity Sheet – (OH)
(EX14.01.01.03)
-Re-formatted and revised to provide a more structured problem solving tool.

-New form number.

  Supplier PPAP Checklist

(EX2.03.00.04)

-Clarify the number of sample parts required.
  Supplier Contact List

(PR6.01.00.02)

-Provide space to designate Quality Contact detail for 1st/2nd/3rd Shifts.

-Added “Hours of Operation”.

  Supplier Logistics Questionnaire

(PC15.01.00.05)

-Added Manufacturing Facility location and hours information.
  Inspection Standard

(EX2.03.00.01)

-Clarified note about Cpk requirements for critical characteristics.  Cpk is required unless otherwise noted.
  Returnable Packaging Deviation Request

(PC15.01.00.06)

-Added Reason Code 4 – others.
  Tool Record Sheet

(PR7.04.00.01)

-New Form.
  Capacity Evaluation Sheet

(PR6.01.00.03)

-Added formulas and comments as instructions for how to complete the form.
  Quotation Details

(PR6.01.12.01A)

-New form number.

 

May 30, 2008

(continued)

High Volume Production Trial Check Sheet -New Form.  
  Supplier 3I-3A Investigation Activity

(EX14.01.01.04)

-New Form.  
  Tooling Progress Report

(EX2.03.00.03)

-Re-formatted and revised to provide a more structured planning tool and added a section to track revisions.  
  Confidentiality Agreement -New Form.  
  Supplier Survey -New Form.  
  NAFTA  Parts Content Certification form and Instructions -New Form.  
  AIAG Label format -Updated.  
  Toyota Label format -New.  
July 1, 2010 Section II: Purchasing -Clarify that any exception to policy in the SPM must have DTR’s written approval.

-Delete option to note/approve any deviation from the Standard Conditions of Purchase.

-Change Request for Quotation to Request for Proposal (RFP).

-Specify written communication and approval for deviation from the drawing.

-Add 5) the invoice to the items needed for tooling payment.

-Remove supplier reporting of minority expenditures.

-Change Master Purchase Order to Master Purchase Agreement.

-Add “change to purchase price” to reasons for a Master Purchase Agreement.

-New section “Labor Agreement”.

-Various other wording corrections / clarifications.

 

 
  Section III: Production Part Approval Process -Define Cpk must be conducted with data set of 25 subgroups.

-Define Gage R&R to be done with ANOVA method – reference AIAG MSA with 3 operators, 10 samples, 3 trials.

-Require use of Change Label for initial shipments.

 
  Section IV: Supplier Performance Evaluation -Reword DTR’s requirement for 100% on time delivery.

-Change the specified activity for unacceptable performance.

-Remove the cost evaluation for “new items”.

 
  Section VII: Process Change Request -Require a Change Label on each container/tote/box with notification to the QA Department.  
July 1, 2010 (continued) Section VIII:  Advanced Product Quality Planning -Under the required planning documents, changed “Change Label” to New Production Product Label”.  
   

 

 

Section X:  Packaging, Labeling, Delivery & Ordering/Inventory

-Clarify 40 lb. container weight is for handheld containers.

-Define that the confirmed manifest must be faxed or emailed to the issuing specialist.

-Define and 2nd Stage material be placed on separate skids.

-Changed DTR/Toyota Label to DTR/Customer Label and defined that the DTR/Customer Label file is deleted after printing.

-Add $50 charge for failure to ship against the correct manifest or PO#.

-Various other wording corrections/clarifications.

 
  Section XI:  Accounting -Request purchase orders with multiple part numbers be billed on one invoice

-Added “and confirmed by DTR Receiving Dept.” to payments

-Added the option to send invoices via fax or email

 
  Section XII:  Control of DTR Owned Material and Equipment -Require the supplier to submit the Tooling/Equipment Inventory List by the end of January each year.

-Revise the requirements for the retention of tooling.

 
  Section XV: Trade Compliance -New Section.  
  Section XVI: DTR Global Working Conditions -New Section.  
  Section XVII: Conditions of Purchase -Re-numbered section.  
  Section XVIII: Acronyms and Their Meanings -Added C-TPAT, NAFTA and PCC and re-numbered section.  
  Section XIX: DTR Terminology – Added C-TPAT and re-numbered section.  
  Section XX: Forms -Added new form titles and re-numbered section.  
  FORMS  
  NAFTA  Parts Content Certification form and Instructions -Added email line and DTR logo to the form.  Added picture of the form showing each step location and removed a specific person from the fax area of the instructions.  
  NAFTA Certificate of Origin -New Form.  
  C-TPAT Questionnaire -New Form.  
  TS-16949 Quality System Registration Waiver -New Form.  
  Supplier Process Change Request

(MF9.04.01.02)

-Added APQP to Manager Approval section.  
  Certified Shipment Label -New Form.  
July 1, 2010 (continued) DTR-OH Supplier Countermeasure Activity Sheet

(EX14.01.01.03)

-Reformatted.  
  Tooling Progress Report

(EX2.03.00.03)

-Added TPR Change Point Log.  
  Supplier Mass Production Readiness Check Sheet

(EX7.01.01.01)

-Replaces the High Volume Production Trial (HVPT) Check Sheet.  
   

 

Supplier PPAP Checklist

(EX2.03.00.04)

-Added Capacity Study.

-Added AIAG format clarification for control Plan and PFMEA.

-Added ANOVA method clarification to Gage R&R.

-Added CQI 9, 11, 12 Survey for Plating, Coating and/or Heat Treat, if applicable.

 
  Supplier Contact List

(PR6.01.00.02)

-Removed Tami Sherman and added Patti Swallow for Purchasing Contact.  
  Returnable Packaging Deviation Request

(PC15.01.00.06)

-Added spaces for Quantity of Cardboard and Cost per Cardboard Container.  
  Sort Preparation Check Sheet

(QA13.01.05.01)

-New Form.  
April 1, 2015 Section I: Introduction -Clarify Supplier certification requirement.  
  Section II: Purchasing -Add paragraph 2 for clarification purposes.

-Grammatical corrections.

 
  Section III: Production Part Approval Process -Change Change Label to Change Point Label.

-Add comment that PPAP reference drawing must be 100% ballooned.

-Add requirement for RPN above 50 to have recommended actions in place.

 
  Section IV:  Supplier Performance Evaluation -Add targets to Performance Report.

-Change Nuisance level from “results in” to “requires”.

-General revisions.

-Add Supplier Improvement Section.

 
  Section V: Corrective and Preventative Action -Add requirement for an QIS that is 30 days past due to be presented in person and this potentially results in an additional QIS for late countermeasure.

-Add requirement for in person presentation for any customer related QIS.

-Revise DTR Safety Rules to explain Smoking is not permitted in DTR-OH and only in outside designated areas in DTR-TN.

 

 
  Section VII: Process Change Requests -Revise and expand Types of Changes.

-Change Change Label to Change Point Label.

 
  Section VIII: Advanced Product Quality Planning -Change Change Label to Change Point Label.

-Add TPR to the list of tracking documents.

-Clarify evaluation of APQP performance.

-Grammatical corrections.

-Eliminate “Ship to 2nd Stage Inspection”.

 
  Section X:  Packaging, Labeling, Delivery & Ordering/Inventory -Revise requirement for DTR Container Inventory from January 1st each calendar year to when requested.

-Add separate and unique maximum loaded pallet height for OH and TN.

-Incorporate Wood Treatment Requirements into this section, previously an Addendum.

-Remove Part Shipping Status from Labeling.

-Grammatical changes.

-Change origin of manifests.

-Add detail explaining DTR will not supply returnable container for Supplier WIP.

-Increase fees for non-conforming paperwork DIS, Admin Fee.

-Add Past Due DIS/Countermeasure Fee.

 
  Section XIII: Lot Traceability -Revise the department to whom documents are delivered to DTR APQP.

-Revise Instructions.

 
  Section: XV: Trade Compliance -Change expectation from certified to compliant.

-Clarify window person as Trade Compliance Specialist.

-Additional details in Container Security and clarify responsibility of delays and costs lies with supplier.

-Complete Revision.

 
  Section XVIII: Acronyms and Their Meanings -Add title.

-Add C/M, MP, NG, Poka-Yoke, PPH.

 
  FORMS    
  New Production Product Label

(EX2.02.00.01)

-Disuse.  
  Inspection Standard

(EX2.03.00.01)

-Revised comment under Inspection Method.  
  DTR Supplier PPAP Check List

(EX2.03.00.04)

-Add notes to align with Section III text revisions.  
  Supplier Mass Production Readiness Checksheet

(EX7.01.01.01)

-Complete Revision  
  Supplier 3I-3A Investigation Activity

(EX14.01.01.04)

-Add comments to every input field for instruction.

-Add/change many fields.

 
  Change Point Label

(MF7.01.02.01)

-New form replacing previous New Production Product Label.  
  Supplier Process Change Request

(MF9.04.01.02)

-Revise DTR approval section to allow for 2 Technical approvals.  
  Standard Packaging Form

(PC15.01.00.01)

-Add Peak BOM volume.

-Add DTR Internal sign off.

 
  Delivery Shortage Form

(PC15.01.00.02)

-Revise Heading to “QUANTITY THAT WILL BE SHORT”  
  Supplier Contact List

(PR6.01.00.02)

-Add date to form.  
  Capacity Evaluation Sheet

(PR6.01.00.03

-New format.  
  DTR Container Inventory

(PR6.01.00.05)

-Change report frequency from annual to upon request.  
  DTR Tool Record Sheet

(PR7.04.00.01)

-New format.  
  Sort Preparation Checksheet

(QA13.01.05.01)

-Add gage information.

-Add requirement to keep parts with original lot number.

-Add Sorting Finished Goods requirements.

 
  Countermeasure Activity

Sheet – TN

-Complete Revision  
April 1 2017 Name Change Change Name and Logo from DTR to SRK